PR-4 Construction Quality Control (pdf 148 kb)

Greenroads Manual

PR-4: Construction Quality Control

Goal

Have a process in place to monitor and improve construction quality.

Requirements

The prime contractor shall establish, implement, and maintain a formal construction Quality Control Plan (QCP). The QCP must address the following quality control elements:

  1. Key quality control personnel, their responsibilities and their qualifications.
  2. Procedures used to control quality during construction including (as a minimum):
    1. Items to be monitored
    2. Testing to be done (including testing standards and frequency)
    3. When corrective action is required (action limits)
    4. Procedures to implement corrective action

Documentation

  PR-4 Construction Quality Control

 

Share

powered by webkey

182