Goal
Create an accounting and management plan for road construction waste materials.
Requirements
Establish, implement, and maintain a formal Construction and Demolition Waste
Management Plan (CWMP) during roadway construction. The CWMP should be
included in the project contract documents and contain, at minimum, the following
information:
- Type of construction waste
- Expected (or actual) tonnage
- Costs and fees for landfills, recovery facilities, and hauling
- Contact information of responsible party for hauling
- Destination of waste (e.g. recycling facility, landfill, contractor’s backyard)
- Contact information of responsible party for disposal site
Documentation
PR-6 Waste Management Plan
Share
Comment on credit PR-6
Thanks for the helpful tips, GingerM (NPS-GM). We will make sure these make it into the next published errata and revisions to the Manual. We appreciate your help!
Page 2, Vancouver Case Study, Par. 1, Line 4 Change This waste had been previously been disposed in . . . to This waste had been previously disposed of in
Page 3, Potential Issues, 2.
Change Potential exists for tracked data due to be measured inconsistently. . . to Tracked data may be measured inconsistently. . .
Page 6, 1st complete paragraph, Line 5 Change (NEWMOA 2009. To (NEWMOA 2009). NPS-GM
Greenroads Manual Version 1.0 Review
You must be logged in to the Greenroads website in order to post comments on the manual. If you already have an account, please log in using the green login box in the upper right portion of the screen. If you do not have an account but wish to comment, please sign up for one here.
Thanks,
The Greenroads Team